All notable changes. Semantic versioning; the release train is fall-2026.
[1.0.0-rc.1] — 2026-09-11
Fall 2026 Release candidate. Nothing in the engines has changed; this repo is content, worksheets and the release contract.
Added
MANIFESTO.md— the one-page checklist manifesto; printable asdocs/MANIFESTO.pdf.RELEASE.md— the Fall 2026 release train, the correct version of each repo, live-vs-fall table, release checklist.- Level worksheets and checklists, one hour or less each, scenario-based on FailFest cases:
levels/100-begin,levels/200-retrofit,levels/300-hold,levels/400-prove— each withWORKSHEET.md,CHECKLIST.md, and apolicy.yamlwhere the level declares one. catalog/— practitioners’ policies by PR (folds into Umbrella in Fall).docs/PRD-OPEN-SOURCE-UNIFIED.mdv3 (whole-estate),ESTATE-MAP.md,STANDARDS-MAP.md,GLACIS-ALIGNMENT.md,MEMBER-ACTIVITIES.md,DECISIONS.md.docs/PRD-PREPEND-PROVE-IT-GATE.md— PRD v1 preserved verbatim as the source thinking.
Decided
- 11 Sept (evening): the café —
index.htmlis the front door: Wren asks what brought you in; five doors on real cases; the Wren Card built in the browser. Consolidation: checklists are the worksheets’ last page (CHECKLIST.mdremoved);FLOW.md→docs/FLOW.md(one object, one home); the PRDs, decisions and maps moved todocs/reference/;README.mdis a short pointer. - 11 Sept: Bob — yes to D1–D11 and the redesign’s R1–R11 via the Decision Sheet; executed the same morning (see docs/DECISIONS.md). Ken’s column open.
[0.2.0] — 2026-09-11 (morning)
- PRD v2: the practitioner ladder (100–400), five parts, level kits.
[0.1.0] — 2026-09-11 (project created)
- Project
Open-Source-Unified-Sept-2026created from PRD v1 (10 Sept).